All specifications and materials are subject to change without notice, E.&O.E.
Developer shall have the right to make reasonable changes in the plans and specifications. If required in the opinion of the Developer and to substitute other material for that provided for herein with material that is of equal or better quality. Color texture, appearance, etc. of features and finishes installed in the suite may vary from Developer’s samples as a result of normal manufacturing and installation processes.
All specifications and materials are subject to change without notice, E.&O.E.
Developer shall have the right to make reasonable changes in the plans and specifications. If required in the opinion of the Developer and to substitute other material for that provided for herein with material that is of equal or better quality. Color texture, appearance, etc. of features and finishes installed in the suite may vary from Developer’s samples as a result of normal manufacturing and installation processes.